Fairfield High Preparatory School
Work to the school was completed in 2014, and consisted of a new auditorium, administration area, field house, and renovations made to existing classrooms and administration areas. The school features a unique look made complete with detailed cast stone columns that is carried on throughout the exterior and interior design.